Technical Sections

The Technical Sections listed below provide detailed requirements for Division 01. The AE shall be responsible for incorporating these requirements into Contract Documents, editing to make the information specific to the project, and adding missing information as required.

Informational notes to the AE have been included as appropriate and are intended to be removed by the AE during the editing process.

In some cases, specific codes have been referenced without an edition date. Specific edition dates have been grouped in the “Codes, Standards, and Regulations” document of these Standards for ease of updating as new codes are adopted. Note that the U of I does not automatically adopt the most recent edition of a code. The AE should insert the appropriate code editions into Construction Documents during the editing process.