Approved Campus Traffic Closure - Bike Path + Sidewalk immediately South of Evans Hall from Goodwin Ave to the Busey Residence from 6/10/2019 to 8/5/2019

Closure Begins:
06/09/2019 19:00:00
Reopens:
08/05/2019 19:00:00
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk + Bike Path

Intersecting Streets which are affected or define limits of closure: Bike Path + Sidewalk immediately South of Evans Hall from Goodwin Ave on the West to the Busey Residence sidewalk on the East.
Reason for Closure:
Contractor is performing demolition in this area (See attached CSK) and due to ongoing construction at Freer Hall, rerouting bicyclists and pedestrians is impractical.

Evans hall Traffic Closure 1
Evans Hall Traffic CLosure 2

Additional Closure Information:  Approved Sidewalk & Bike Path Closure - South of Evans Hall for roof work starting 6-10-19

  • Contact: Hector Romero
  • Phone: 708-942-9241